MS-5   june-2010

MS-5 : MANAGEMENT OF MACHINES AND MATERIALS

1. a) Why does the "proper" operations strategy keep changing for companies that are world-class competitors ?

(b) Some suggest that customer expectation is the key to service success. Give an example from your own experience to support or refute this assertion.

2.(a) "You don't inspect quality into a product; you have to build it in". Discuss the implications of this statement.

(b) Find the economic order quantity and the reorder point, given the following data :

Annual demand (D) = 1000 units. Ordering cost (S) = Rs. 50 per order. Holding cost (H) = Rs. 12.50 per unit per year Cost per unit (C) = Rs. 125.00. Lead time (L) = 5 days. Assume 250 working days in a year.

3. (a) Why are work measurement and time study activities still necessary today ?

(b) A company that produces pleasure boats has decided to expand one of its lines. Current facilities are insufficient to handle the increased workload, so the company is considering three alternatives, A (new location), B (subcontract), and C (expand existing facilities). Alternative A would involve substantial fixed costs but relatively low variable costs : fixed costs would be Rs. 25,000,00 per year, and variable costs would be Rs. 5000

per boat.

Subcontracting would involve a cost per boat of Rs. 25,000 and expansion would require an annual fixed cost of Rs. 5,00,000 and a variable cost of Rs. 10,000 per boat. For what range of output would each alternative yield the lowest total cost ? Which alternate would yield the lowest total cost for an expected annual volume of 150 boats ?

(a) How does the role of a project manager differ from that of a traditional functional

manager ?

(b) An industrial engineer conducts a time study on an operator and determine that a specific task takes about two minutes to complete. The engineer estimates that the particular operator that she is observing is working about 20 percent faster than normal. The company has an allowance factor of 15 percent of job time for personal needs, delays, and fatigue. Calculate the standard time for this task.

5(a) Explain value engineering giving its area of application in some industry which you are aware of.

(b) There are seven jobs that must be processed in two operations. A and B. All seven jobs must go through A and B in that sequence A first, then B.

( i ) Determine the optimal order in which the jobs should be sequenced through the process using these times.

Job

1

2

3

4

5

6

7

Machine A

9

8

7

6

1

2

4

Machine B

6

5

7

3

2

6

7

ii) Draw a graph similar to the solved problems showing the sequence of jobs.

iii) What is the total completion time for all seven jobs

 

6. The following activities are part of a project to be scheduled using CPM :

Activity

Immediate Predecessor

Time (Weeks)

A

-

6

B

A

3

C

A

7

D

C

2

E

B,D

4

F

D

3

G

E,F

7

a) Draw the network

b) What is the critical path ?

c) How many weeks will it take to complete the project ?

d) How much slack does activity B have ?

 

7. Write short notes on any four of the following :

a) Preventive Maintenance

b) Automated storage/retrieval

c) CAD/CAM

d) ABC Analysis

e) Tero Technology

f) LIFO system

MS-5   june-2011

MS-5 : MANAGEMENT OF MACHINES AND MATERIALS

1. (a) How is value added to any entity using operations function ? Explain the conceptual model of a 'Operations System'.

(b) Discuss life cycle approach in Operations Management. Use examples to elaborate.

2. (a) What is Product Design ? How does it influence the Process Design ? Explain with examples.

(b) What type of layout would you suggest in designing a big hospital ? Discuss.

3. (a) How is computerized layout planning is done ? Discuss its benefits and different

softwares used for this purpose.

(b) Define capacity. Explain the process used for capacity planning. Take example of any organization of your choice.

4. (a) Why is material handling important ? Discuss its classification.

(b) What are common classification systems of materials ? Explain importance of

codification and standardization of materials.

5. (a) What are different forms used by purchase department ? Discuss different criteria

employed for evaluating purchasing system.

(b) Discuss importance of Value Engineering. Also list its various phases.

6. (a) What is acceptance sampling ? Explain different types of sampling plans. Explain

Operating Characteristic Curve.

(b) Why are control charts used ? Discuss mean and R type of control chart. Give its importance.

7. (a) Where do we use work sampling ? Explain its step as used for standard time determination.

(b) Discuss ABC system of Inventory Control. Give its variants as used in Industry.

8. Write short notes on any two of the following

(a) Methods Study

(b) Programme Evaluation and Review Technique.

(c) Assembly line

(d) Planning and Control for job shop production

Tuesday, 06 November 2012 13:38

Ms-5 Dec 2007

Written by

MS-5   Dec, 2007

MS-5 : MANAGEMENT OF MACHINES AND MATERIALS

l. (a) Explain how the system concept can be used in explaining the terms waste and waste management.

(b) A company is considering adding a new feature that will increase unit sales by !2 percent and product cost by 10 percent. Profit is expected to increase by 16 percent of the increased sales. Initially the product cost incurred by the company was 63 percent of the sales price. Should the new feature be added ? Justify your answer.

2. (a) Four different organisations are considering youl home town as a potential location for one of the following :

(i) A medical research centre

(ii) A softdrink producer

(iii) A steel plant

(iv) A software producer

Select any  one of the above four and systematically evaluate the relevant locational factors.

(b) A worker in an engineering corporation is expected to work for 420 minutes in a shift of 8 hours . the remaining time, i.e. 60 minutes is meant  for rest and personal needs etc.

Determine :

(i) Standard time per piece of a job whose normal time is 4 minutes.

(ii) If the operator produces 120 pieces in the shift, what is his efficiency ?

3. a)Explain different types of maintenance, giving suitable examples. Suggest an organisation structure for the maintenance department of a medium-sized company

   (b) A small manufacturing firm has three proposals for a product. Either it can be purchased from an outside vendor at Rs. 4 per unit or it can be manufactured in-plant. There are alternatives for in-plant-manufacturing. One option it that a fully

automatic unit is procured involving fixed cost of Rs. 30,000 and variable cost of Rs. 275 per unit. Alternatively, a semi-automatic unit would cost Rs. 20,000 as fixed cost and Rs. 3 per unit as variable cost.

Draw a break-even chart for these alternatives. Suggest range of production-volume suited for these alternatives.

4. a) Explain various factors that govern the design of any layout of a plant. Give suitable examples.

   b) There are seven jobs as under, each of which has to go through machines A and B in that order. The processing time is in hours.

Job

1

2

3

4

5

6

7

Machine A

3

12

15

6

10

11

9

Machine B

8

10

10

8

12

1

3

Determine the sequence of jobs that will minimize the total time for completion of all the jobs.

5. (a) What do you understand by Quality ? What is the difference between inspection and quality ? Describe the concept of Total Quality Management. How is it different from inspection and quality control ?

b) A repair and maintenance company is engaged in providing service to a particular brand o[ popular vehicle. It uses 8000 units of a moving part per year as replacement of the old parts; each part cost Rs. 250. The set-up costs are estimated at Rs. 100 and the inventory carrying cost is the average of 20% of the inventory cost. Supply of the parts is at the rate of 80 per day.

Calculate the following :

(i) Optimal order quantity

(ii) Optimal number of set-ups

(iii) Total variable cost based on optimal policy

Assume 310 working days in a year

 

6. The R&D department is planning to bid on a large proiect for the development of a new communication system for commercial planes. The following table shows the activities, times, and sequences required

Activity

Immediate Predecessor

Time (Weeks)

A

-

2

B

-

3

C

-

3

D

A

5

E

B

5

F

B

9

G

C

3

H

D

3

I

E

5

J

F,G

6

K

H,I

4

(a) Draw the network diagram.

(b) What is the critical path ?

(c) How many weeks will it take to complete the project ?

(d) Which activities have slack and how much ?

 

7 . Write short notes on any four of the following :

(a) Operating characteristic curve

(b) ABC Analysis

(c) Job Enrichment

(d) CAD/CAM

(e) Tero Technology

(f) Aggregate planning